June 5, 2024@elonmusk →
“@ajtourville The existing factory space was already allocated to vehicle, battery and cell production. And this is not a matter of tucking a few computers into a corner. You need a kW of power and cooling for each GPU, which would mean 12MW of power and 12MW of cooling. The south extension…”
Engagement vs. median curated tweet
4.1K
Likes
466
Retweets
306
Replies
