“Perhaps lost in the transport debate is that @boringcompany built a 6000 ft tunnel in LA for ~$10M with V1 (Godot). Next tunnel will be made with V2 (Line-Storm). V3 (Prufrock), aspirationally 10X better, should be operational next year. For reference: https://t.co/LS4EhN57Mw https://www.citylab.com/transportation/2018/01/why-its-so-expensive-to-build-urban-rail-in-the-us/551408/”